Site quality after commissioning
For the operating phase of your wind turbine, we offer you the determination of the site quality after commissioning as required by the EEG. The site quality review should be carried out after 5, 10 and 15 years of operation.
The calculation for checking the quality of the site after commissioning is carried out in accordance with the procedure described in Technical Guideline 10, which was fully implemented in our in-house process using the SOLLwind® software developed by us.
In addition to the actual operating data (SCADA), data from the entry point (sum of the energy quantities actually fed in), direct marketers (optimized marketing) and network operators (reductions through feed-in management) are also evaluated. The prerequisite for determining technical availability is an assignment of the status codes of the system under consideration to the EEG categories, which must be confirmed by a certificate of conformity.
Due to our successful participation in the round robin tests to determine the quality of the location, which was carried out by the Fördergesellschaft Windenergie und anderer Dezentraler Energien e.V. (FGW), we were able to obtain accreditation for this service from the DAkkS.
The report contains, among other things, the “certificate for submission to the network operator” and serves as proof of the quality of the location of your system after commissioning for the respective period (after 5, 10 and 15 years of operation). We would be happy to provide you with preliminary results before the end of the 5-year period so that you can assess whether you may need to build up reserves or whether you can expect a repayment.